Who we are
Infinity Solutions Co. is celebrating 16 years of continuous endeavor development and expansion in Bangladesh and the International market. Within the rich history of existing in this market for over 16 years, ISCL is now celebrating 12 years of their successful quest in representing Fulton Steam boiler, USA (more than 5000 boilers running in Bangladesh) and 10 Years representing VES Fire detection system, USA having UL&FM, ULC, LPCB and all other certificates which are made in the USA and ship from the USA. Their devices are completely waterproof and short-circuit-proof. We supplied these branded products to more than 450 projects in Bangladesh.
- We also supply fire hydrant and sprinkler system pump from Bristol, UAE, Quantum Pump, UK, Waterford pump from Ireland, and AC fire USA and successfully installed more than 450 projects with this branded pump in Bangladesh.
- We supply Fire hydrant & sprinkler systems for all UL-listed products from China, Dubai, UK & Malaysia.
- We supply ventilation Systems from Kruger, Malaysia.
- ISCL supplies the Central Air Conditioning system from Dunham-Bush Malaysia, Media (China), Gree (China), Thermax India (VAM Chiller), etc.
- We have a fully automated machine for spiral ducts, square ducts, round ducts, and PU-insulated pipe.
- We also provide complete utility system products like steam valves from Valsteam ADCA Portugal, Armstrong USA, Gestra Germany, etc.
- We supply plumbing & Sanitary from our local stock.
With our continuous development now are doing government mega projects like as follows:
1. CDPL (Chittagong –Dhaka Pipe Line) is a diesel transmission line, one complete section is done by us.
2. Bashundhara Oil & Gas (Bitumen Plant): We are doing complete fire detection & protection system including gas suppression systems and mechanical all kinds of jobs.
3. Ghorashal Urea Fertilizer Company: We are doing complete Central air conditioning & Ventilation system (AC, VFR, Chiller) in this project. We are also supplying copper pipe, insulation, duct, all kinds of valves, fittings, and embedded plates as construction equipment for this project. Also supplied fireproof doors, steel doors, blast-proof doors, fencing net, etc. for this same project.
4. Borguna 350 MW Coal-based power plant: Supplied complete central air conditioning & Ventilation system (AC, VFR, Chiller).
5. First Dhaka Elevated Expressway: We supplied Central air conditioning & ventilation system (AC, VRF, Chiller, HVAC & ventilation fan).
6. We also supplied a complete fire protection system in Bangladesh’s first Metro Rail project.
Published on: Wednesday, 10 May 2023, 02:58 am ▪ Last update: Wednesday, 10 May 2023, 03:12 am ▪ Total View of this Page: 658